We’re pleased to report that GreenMine has been awarded advanced assurance for the Enterprise Investment Scheme (EIS). This assurance confirms that HMRC agrees that an investment in GreenMine would meet the conditions of a venture capital scheme and that the company can issue certificates to investors to claim tax relief. All businesses applying for the EIS must submit extensive data for HMRC’s due diligence process, including the business plan and financial forecasts, how investments will be used, details of all trading, activities and expenditures, and the investor proposal. What is the EIS? The EIS was launched in 1994 by the UK government as [...]
Read MoreWe have kicked off work with our specialist GIS software to identify suitable landfill sites specifically for landfill mining remedial operations. We're on a mission to clean up the environment by providing a ground-breaking solution for pollution emitting from problematic sites. We aim to remove the reliance on landfill sites and create the opportunity for sustainable urban living that aesthetically blends with local landscapes. Furthermore, our technology is capable of both generating energy and sequestration of carbon. What is GIS? A GIS (geographic information system) software program is designed to provide the ability to create, store, manage, query, analyse and visualise geographic data [...]
Read MoreAs a quick brief, GreenMine has co-developed technology that can process UNSORTED waste on an emission free basis. GreenMine will now start small waste projects around the UK in phase 1 of their ambitious plans. In phase 2, GreenMine will increase the size of the Waste Processing Units and start processing, remediating, and cleaning 50 Hectare + landfill sites ready for redevelopment of housing. Where possible GreenMine will encourage Eco-Housing, which is more attractive to consumers and can command a higher price from developers for the land. GreenMine – solving waste and housing Here is the GreenMine update: We have identified several industrial waste [...]
Read MoreWe have secured our first operational site – an industrial location in North Wales. We will take control of the two-acre industrial site from the start of March and have already commenced planning and environmental permitting applications that are anticipated to conclude by the end of 2024. The site has a 20-year lease, with a 20-year feedstock contract and an offtake contract to the National Grid. John Bell, Managing Director at GreenMine said: “This is a really significant milestone for us in commercialising this near-to-zero emissions solution to landfill for the UK. “Our mission goes way beyond the usual benefits of a waste recycling [...]
Read MoreWe have appointed Chris Farmer to lead the project delivery side of our innovative, new solution to landfill. Chris will be working with the wider team on site identification and acquisition, then right throughout the complete project delivery from inception to operation of all new sites. He said: “We’re at a really exciting stage for GreenMine as business leaders grapple with their environmental and sustainability strategies on their journeys to net zero. Our new waste carbonisation technology, with near-to-zero emissions, offers a real game-changing solution to reduce greenhouse gases during the waste disposal process and will play a part in reclaiming historic, [...]
Read MoreGreenMine, the new trading name of Pyrolysise Ltd, is gaining significant traction. GreenMine has co-developed a series of technologies designed for processing unsorted municipal waste (including plastics) from kerbside collection and landfill sites. One of them is detailed here. Municipal waste is a significant contributor to atmospheric pollution with landfill accounting for 4% of greenhouse gases in the UK. Landfills can also contaminate water supply through leachate into the subsoil. With GreenMine's technology, unsorted waste can be processed into bio-coal (allowing energy generation), bio-char (the new black gold), bio-oil (including lignin) and recyclables (glass, metals, minerals etc). Green baseload power and as [...]
Read MoreWe have appointed the multi-disciplinary engineering consultancy, Stopford, to support site due diligence and plant compliance for use in the UK, working towards the target to have our first UK plant operational by Q3 2024. Two potential industrial sites have already been identified specifically for the purpose of a pilot programme for three tonnes per hour plant converting municipal/medical waste to generate electricity for a grid connection. Stopford will undertake a desk study of the selected sites to assess whether they are fit for purpose, and secure planning and environmental permitting as part of its overall due diligence scope of work which also includes monitoring the plants’ performance [...]
Read MoreGreenMine has identified a second site for installation of its Waste Carbonisation Plants (WCP’s). The WCP’s can process unsorted waste, emissions and particle pollutants free, producing offtakes: Mineral Recyclables, Bio-Coal, Bio-Char and Bio-Oil. For these sites and others, we will be working with counterparties on site to utilise the Bio-Coal to develop baseload green energy and export to the grid. The mineral recyclables, bio-char and bio-oils will be sold off separately. One WCP, lease financed for circa £5M, will develop revenues of circa £290K per month. One WCP, which is based overseas, is currently processing 10% Municipal Solid Waste and 90% Plastic – which [...]
Read MoreGreenMine has now contracted Stopford (www.stopford.co.uk) to assist in site due diligence and plant certification for use in the UK. Our first site should be operational in less than 12 months and producing revenues of circa 300k per month. The plant will be lease financed. GreenMine's Video Register for an IM below if your interested in having a look: Get the Information Memorandum